Got a call from the crane guy to remove some big pines, a half day job, I hate that! Sometimes he does that, when he wants me to use his MS 660 with the long bar, his other people don't like to lift it. Lately he's been doing that more to save costs, just wants me for the bigger tree jobs. His prerogative, but I usually bring my own saws anyway, and getting the stuff together, and clean-up afterwards, etc., it pretty much becomes a whole day affair for only a half day's wages.
Even if I get back to my shop early, after the rock and roll, I don't much feel like concentrating on some itty bittty furniture thing. Ain't it a bitch :roll: