This one better shows what we were dealing with
First job was to set up a few lines.
Then we put a little tension in each line. One rope was holding the top half of the broken half. The was holding the lower part that was in the pool.
Then I sliced the broken off piece in half. The ropes helped to make sure they didn't fall more into the pool.
Once that was done we backed the truck up to the edge of the pool and lifted the pieces up and out of the water,
I Müntered the rigging line to the pintle hitch. I'm not sure how kosher that is, but it worked like a champ!
Then all we had to do was chop pieces and chuck them into the truck.
Like I said- the wood was super punky. It was all falling apart and didn't weigh a thing. Here's a piece that was sliced length wise.
Here's a close up of the spaghetti that made up the inside of the tree
It still took us three hours to get it all finished- but you won't hear any complaints from me!
love
nick