flushcut
TreeHouser
Just throwing it out there in Da House, but what's y'alls preference for attaching it to the rigging line? I started using a six coil prussic, then a long braid VT, so I just ordered two steel, one small and one large, gibbs. Lately I have been doing a lot of storm damage, big hangers and stuff on buildings but nothing major, where I need to set two lines one run to the GRCS and the other a control line pretensioned and just got plain tired of tying a hitch.