CurSedVoyce
California Hillbilly
Ok... So I have some of the pictures edited... Holy moly... 2nd day and my butt is beat.
I still don't have day two's pictures done yet.
So... Dead oak over house, walls, patio, arbor, driveway, service.... Multi level yard.
One decent 3' gate to get material out of.
Mini won't go through it due to a 90 degree turn at the gate.. Not happening.
Brought dolly to move bigger wood.
Brought plywood to toss limbs etc onto on the driveway below a lower section of fence where Rob would chip the brush and stack firewood.
Fodder....
Concrete, cables, lighting and decor Oh my! And the metal... Lord.. We are still finding metal... I should have brought a metal detector...
I mean I am seriously wondering if they did not just have some mortar left over from the wall and filled all the holes
We used a drill to see if we could find places between the crete to cut. It's all marked out, so we'll see how we do day 3
I still don't have day two's pictures done yet.
So... Dead oak over house, walls, patio, arbor, driveway, service.... Multi level yard.
One decent 3' gate to get material out of.
Mini won't go through it due to a 90 degree turn at the gate.. Not happening.
Brought dolly to move bigger wood.
Brought plywood to toss limbs etc onto on the driveway below a lower section of fence where Rob would chip the brush and stack firewood.
Fodder....





Concrete, cables, lighting and decor Oh my! And the metal... Lord.. We are still finding metal... I should have brought a metal detector...



I mean I am seriously wondering if they did not just have some mortar left over from the wall and filled all the holes
