The Official Work Pictures Thread

I see a lot of neg rigging and think to myself “a sharp saw and a bit of careful dropping will be quicker and safer”
Not saying that’s the case here, just saying like..
No rigging today. Lots of small pieces carefully placed into the tiny drop zone. I have not destroyed the rhody yet. Had a good storm roll in and crushed my dreams of being done today
 
So befores of the last couple days victim. Two leads (one being a double) canyon live oak leaning at targets. Thinned some of the crown too. And raised the back side tad high for my taste. Butthe newer trees need room. At least I finally got to kill that garbage cypress planted right under the oak canopy. 20250715_093638.jpg 20250715_093638.jpg 20250715_093723.jpg 20250715_093742.jpg 20250715_093813.jpg 20250715_093839.jpg 20250715_093850.jpg
 
Guy lines in. Basically using more established trees to hold the others up. Last storm, couple years back, pushed them over pretty hard. HO used a come a long to pull them back up and secured them with 1" webbing. That webbing is digging into the trees and were trip hazard as he went from the base of one to where he could place it in the other. Now, its done proper with dynamic cabling and slings that will be moved as the young trees grow. Probably every 3-4 years. High enough to not get clothes lined as well while walking about. 20250717_093934.jpg 20250717_093943.jpg 20250717_094009.jpg 20250717_101416.jpg 20250717_101431.jpg 20250717_101437.jpg
 
Back
Top