Normally, for an SRT base tie, I pull my rope up over the branch and tie that "short" end to the trunk. Then I climb the "long" end, most of which is still left in the bag.
For some reason today, after pulling up the rope and seeing the path around a few branches, I decided I'd rather climb the "short" end. I could just pull all the rope through to get to the other end. But say it was a 50' climb and you had 300' of rope in the bag. How would you tie the "long" end together at the bottom?
I'm not wild about the biner. The delta seems plenty strong enough, but how would you do it with just rope?
For some reason today, after pulling up the rope and seeing the path around a few branches, I decided I'd rather climb the "short" end. I could just pull all the rope through to get to the other end. But say it was a 50' climb and you had 300' of rope in the bag. How would you tie the "long" end together at the bottom?
I'm not wild about the biner. The delta seems plenty strong enough, but how would you do it with just rope?