Search results for query: *

  1. MasterBlaster

    Bidding with crane

    That's what I wuz thinking, lulz!
  2. MasterBlaster

    Bidding with crane

    I'm never w/o my sweat towel.
  3. MasterBlaster

    Bidding with crane

    Outstanding!
  4. MasterBlaster

    Bidding with crane

    I thought OSHA/ANSI approved riding the ball, if done properly???
  5. MasterBlaster

    Bidding with crane

    That's so silly. It makes me think they don't really want to do treework.
  6. MasterBlaster

    Bidding with crane

    I have no idea. Here's what it looked like when I made the cut.
  7. MasterBlaster

    Bidding with crane

    Here's a BIG top, but we had the room... barely.
  8. MasterBlaster

    Bidding with crane

    Lordy!
  9. MasterBlaster

    Bidding with crane

    Just check the rotator, on the portal page.
  10. MasterBlaster

    Bidding with crane

    Same here. You NEED to do that in tricky situations.
  11. MasterBlaster

    Bidding with crane

    Remember, I'm in Louisiana...
  12. MasterBlaster

    Bidding with crane

    I've had to shut the job down because the crane operator was freaking out doing treework. Evidently, all he was used to was static loads, AC units and the like. He was wasting our time and money.
  13. MasterBlaster

    Bidding with crane

    That's the one you need to cultivate a relationship with, then.
  14. MasterBlaster

    Bidding with crane

    Yea, if they're not used to doing treework, you're shit outta luck.
  15. MasterBlaster

    Bidding with crane

    Heck yea, they should be charging by the hour. Those guys are nuts. A 22 ton goes 90 bucks an hour, 4 hour minimum here, and will take a load to their dump for an extra hour's fee. A 60 ton is 140 an hour, 4 hour minimum plus a 135 permit fee.
Back
Top