No_Bivy
Treehouser
- Joined
- Sep 2, 2006
- Messages
- 6,459
Broke my third universal joint and decided to try something different. The first from TNT dave was a bolt through the top which eventually wore until it snapped. The second was a PTO universal joint rom my crane guy....third was another universal from a parts house..
The problem with all of them was there was not enough range of motion so it would bind and eventually break. This time I used 3/4 overhead lifting chain, rated for a shitload. Links measure 4" long each. Only two half and one full link were needed. We turned a 2 1/4 " shaft which comes down through the top. Pretty damn simple. This joint has full range of motion....so far so good.
The problem with all of them was there was not enough range of motion so it would bind and eventually break. This time I used 3/4 overhead lifting chain, rated for a shitload. Links measure 4" long each. Only two half and one full link were needed. We turned a 2 1/4 " shaft which comes down through the top. Pretty damn simple. This joint has full range of motion....so far so good.