Search results for query: *

  1. greengreer

    chipper winch speedline

    You could weld an attachment point on your fairlead and just run the rope to that to get them in the table. I get what you mean about tightening up to chip but then the climber can't be doing anything with the rope. I like to do big volleys (like 10-15 at a time) and then have the ground crew...
  2. greengreer

    chipper winch speedline

    I won't use the winch for a speed line. Too hard to control tension and too slow to dump the piece when it gets into the dz. If I can go right to the chipper I tie a small porty to the frame or a redirect if it requires mechanical advantage. If I absolutely was going to use the winch to...
Back
Top