Search results for query: *

  1. chris_girard

    Crane Job Over Wires.

    So yes, everything went really well on todays crane job (sorry, to busy to take pictures). In regards to the limbs over the wires, I kept it really simple. I had the crane operator take me way out on the limb (my climb line was kept with me in my rope bag) and tied it with one 20' long 1/2"...
  2. chris_girard

    Crane Job Over Wires.

    Oh yeah, I remember how much "fun" Ekka had with the pics, he was all bent out of shape over them.
  3. chris_girard

    Crane Job Over Wires.

    Thanks guys for the info and Butch for the pics (those are the ones that I remember). Will have 2 long slings on each pick, as there is the potential for torqueing and will listen to my CO, as he is also an experienced climber.
  4. chris_girard

    Crane Job Over Wires.

    So I have a crane removal scheduled for tomorrow on a large Red Oak. Two of the large horizontal limbs hang over the 3-phase. I have around 8'-10' vert. clearance. It was too long of a weight to have the lines covered, plus the power company wanted me to sign some OSHA forms which I wasn't too...
Back
Top